Birmingham New Hospital. Joint Venture Balfour Beatty Engineering Services.

Description: Prefabrication and installation 500 Ø DIA.CH.WAT and 300 Ø dia L.P.H.W plant rooms, 17 off chillers, and mains distribution throughout all 3 sectors level 8 roof. Prefabrication and installation of CH.WAT and L.P.H.W to 60 off A.H.U's inclusive of distribution mains and valve set arrangements. Prefabrication and installation of 350 Ø dia stainless steel quencher pipework from 5 off M.R.I. Scanners. Prefabrication and installationof natural gas pipework throughout all areas inclusive of testing, purging.
Value: £5 million
Contact: Mr. P. Siviter B.B.E.S. (M.E. Co-ordinator)

Glaxo Smith Kline, Ware, Herts.

Description: Contract works consisted of numerous facilities brough on line, for new research and production P.S.S works involved prefabrication and installation of many different services including process associated with Ware plant upgrade. The works had to be carried out over a 2 year period.
Value: £1.6 million
Contact: Mr. R. Moore (Project Manager)

Jaguar Cars Limited, Castle Bromwich.

Description: Fabrication and installation of stainless steel process piping and mechanical services associated with the pretreatment/ electrocoat facilities within the new paintshop.
Value: £2.6 million (labour, plant and materials)
Contact: Mr. A. Coles (Project Engineer)

Toyota Manufacturing (UK) Ltd, Derby.

Description: Fabrication and installation of stainless steel process piping and mechanical services associated with the pretreatment/ electrocoat facilities within the new paintshop.
Value: £1.8 million (labour, plant and materials)
Contact: Mr. S. Mills (Project Manager)

Briggs Forrester, Bristol. Project Dyson, Cirencester.

Description: Installation of mechanical, domestics, A.B.G.D. pipework services and off-site prefabrication to facilitate listed projects. New development and Technology Centre. Phase 1.
Value: £800,000
Contact: Mr. Josh Hopkins (Project Engineer)

Balfour Beatty, Solihull, Birmingham. University of Birmingham, Edgbaston.

Description: Installation of mechanical, domestics, A.B.G.D. pipework services and off-site prefabrication to facilitate listed projects. 800 student accommodation, incorporating 7 off plantrooms.
Value: £1.2 million
Contact: Mr. Andy O'Connor (Project Manager)

Lorne Stewart, Redditch. Western Custody Suite, Oldbury, W. Mids.

Description: Installation of mechanical, domestics, A.B.G.D. pipework services and off-site prefabrication to facilitate listed projects.
Value: £450,000
Contact: Mr. Stuart Parsons (Project Engineer)

Briggs Forrester, Northampton. R.A.L. Didcott Space Technology Centre.

Description: Installation of mechanical, domestics, A.B.G.D. pipework services and off-site prefabrication to facilitate listed projects.
Value: £850,000
Contact: Mr. Colin Smith (Project Engineer)

Shepherd Engineering Services, Birmingham. Holy Trinity & Lakeside Academies, Telford School.

Description: Installation of mechanical, domestics, A.B.G.D. pipework services and off-site prefabrication to facilitate listed projects.
Value: £500,000
Contact: Mr. Terry Dukes (Project Manager)

Briggs Forrester, Birmingham. Queen Elizabeth Hospital, Institute of Technical Medicine.

Description: Installation of mechanical, domestics, A.B.G.D. pipework services and off-site prefabrication to facilitate listed projects.
Value: £480,000
Contact: Mr. Mike O'Sullivan (Project Manager)

Briggs Forrester, Northampton. J.L.R. Castle Bromwich.

Description: Installation of mechanical, domestics, A.B.G.D. pipework services and off-site prefabrication to facilitate listed projects.
Value: £750,000
Contact: Mr. Colin Smith (Project Engineer)